A very successful 3 days for a new customer installing 150 metres of SDR11 500mm IP gas main under a deep water course running at 13 metres deep using our Vermeer 100/140 in very challenging adverse ground conditions. READ MORE
Successful Installation of 150m SDR11 500mm IP Gas Main Beneath 13m-Deep Watercourse Using Vermeer 100/140
We recently completed a highly successful three-day project for a new client, installing 150 metres of SDR11 500mm Intermediate Pressure (IP) gas main beneath a deep watercourse running at a depth of 13 metres. The installation was carried out using our state-of-the-art Vermeer 100/140 directional drilling rig, renowned for its precision and reliability in complex environments.
This challenging operation was performed under extremely adverse ground conditions, testing both equipment and expertise. Despite the difficulties, the project was delivered on time and to the highest safety and engineering standards—highlighting our commitment to excellence in trenchless technology and gas infrastructure solutions.
“Professional and efficient – GB Drilling delivered exactly what we needed with minimal disruption. Highly recommended!”