THE BRIEF
installation of 130 metres of 180mm gas main under the A21 dual carriageway READ MORE
installation of 130 metres of 180mm gas main under the A21 dual carriageway READ MORE
A recent nightwork project on the A21, starting with the Vermeer 40×55 but due to adverse ground conditions we had to mobilise our AT40 Ditch Witch Rock drill to assist with the installation of 130 metres of 180mm gas main drilling down to a depth of 12 metres to cross under the A21 dual carriageway.
This project was executed in three 9 hour night shifts.