THE BRIEF
We installed numerous 180mm and 110mm ECD under carriage way – this was via numerous drill shots ranging from 65m to 115m. READ MORE
We used numerous drill machines ranging from Vermeer 40×55 to Ditch Witch AT30 Rock Drill, where we successfully installed 180mm and 110mm ECD under numerous carriageways and hedgerows, the numerous drill shots ranged from 65 metres to 115 metres.
This job was completed in 2 months with a total pipe installation of 2,235 metres.